Your search returned 4 results. Subscribe to this search

|
1. Integrated resource plan public engagement program : what was said, final report / N|A|T|I|O|N|A|L.

by -- N|A|T|I|O|N|A|L; New Brunswick Electric Power Commission; NB Power

Material type: book Book; Literary form: not fiction ; Audience: Specialized; Publisher: [S. l. : s. n.], 2017Online Access: Electronic document (PDF) [en] Availability: Items available for loan: [CA2 NB EPC I5601 2017] (2).
2. Coleson Cove generating station refurbishment project: environmental impact assessment, final report.

by -- New Brunswick. Electric Power Commission

Material type: book Book; Format: print ; Literary form: not fiction Publisher: [Fredericton, N. B. ] : The Commission, [2002.]Online Access: Electronic document (PDF) [english] Availability: Items available for loan: [CA2 NB EPC C51 2002] (2).
3. Rivers, dams & floods with particular reference to the 1973 Spring runoff on the Saint John River / by J. O. Dineen.

by Dineen, J. O; Hayward, D. G. -- New Brunswick Electric Power Commission; H. G. Acres Company Limited

Material type: book Book; Format: print ; Literary form: not fiction Publisher: [S. l. : s. n.], 1974Other title: Rivers, dams and floods.Online Access: Electronic document (PDF) [en] Availability: Items available for loan: [CA2 NB EPC R32 1974] (3). Items available for reference: [627.8 D583] (1 ).
4. Electric power and water management in the Saint John River Basin for the Saint John River Basin Board / prepared by O. T. Sigvaldson.

by Sigvaldason, O. T. -- Saint John River Basin Board; Acres Consulting Services Limited; The New Brunswick Electric Power Commission

Material type: book Book; Literary form: not fiction Publisher: [S. l. : s. n., 1975Online Access: Electronic document (PDF) [en] Availability: Items available for loan: [CA2 NB SJR E46 1975] (2).

Powered by Koha